Full Electrical 3 Phase Service Upgrade for Thornleigh Property – New Private Pole, Underground Mains and Main Switchboard + Smart Meter

  • Home
  • Project
  • Full Electrical 3 Phase Service Upgrade for Thornleigh Property – New Private Pole, Underground Mains and Main Switchboard + Smart Meter

Project Information

Clients Wesley Johnson
locations Bondi Junction
Date 03 March 2024 - 04 March 2024

Full Electrical 3 Phase Service Upgrade for Thornleigh Property – New Private Pole, Underground Mains and Main Switchboard + Smart Meter

Our client in Thornleigh, located in Sydney’s Upper North Shore, required a comprehensive 3 Phase electrical upgrade to allow for a higher current carrying capacity to allow for new EV charging, Battery system and Solar. In doing so we had to also  address a major compliance issue. The existing single-phase aerial mains were crossing a neighbour’s property — a serious defect that posed safety risks and did not meet current standards.

This residential project involved a full-service upgrade, including installing a new private pole, a 3-phase power supply underground, and a complete switchboard replacement to bring the property up to Australian Standards.

The Challenges

The property faced several challenges that needed immediate attention:

Our Solution

Our licensed electricians at Scott Electrics delivered a complete and professional electrical service upgrade, which included:

  • Installing a new private pole to rectify the cross-boundary defect and establish a compliant aerial connection.

  • Upgrading to 3-phase aerial mains, replacing the non-compliant single-phase system.

  • Running new 3-phase consumer mains (16mm 4-core XLPE) in heavy-duty conduit from the private pole to the main switchboard underground.

  • Installing a new main switchboard, equipped with:
       1] Surge Protection Devices (SPD/MPD) for service and meter protection.
       2] A new 3-phase smart meter for accurate and future-ready energy monitoring.
       3] New RCBOS safety switches for every circuit to enhance protection.
       4] current-limiting protection/circuit breaker main switch to manage load safely.

  • Upgrading the earthing system, including a new earth stake and water pipe bonding, to ensure complete safety and compliance.

  • Safely removing asbestos to meet health and safety requirements and deliver peace of mind.

The Outcome

The full-service upgrade successfully addressed all compliance and safety issues on the property.

The client now benefits from the following:

As always, the Scott Electrics team delivered high-quality workmanship, expert advice, and a smooth project experience from start to finish.

Need Electrical Work Like This?

Facing an electrical defect or looking for a full-service upgrade in Sydney’s North Shore?

Contact the trusted team at Scott Electrics today.

We deliver safe, compliant, professional solutions you can rely on.


Explore